National Rail says disruption to trains through Brockenhurst from a signalling fault has ended. It marked the incident cleared at 1.49pm on Tuesday 17 November.
Update, 2.25pm: National Rail marked the incident cleared at 1.49pm and said: “Disruption caused by an earlier fault with the signalling system in the Brockenhurst area has now ended.”
Trains through Brockenhurst could be cancelled or delayed by up to 30 minutes on Tuesday morning because of “a fault with the signalling system”, National Rail said.
- What: Trains had “to run at a reduced speed on all lines”.
- Where: The Brockenhurst area, affecting South Western Railway between Weymouth and London Waterloo and between Poole or Bournemouth and Winchester, and CrossCountry between Bournemouth and Nottingham or Manchester Piccadilly.
- When: Reported at 9.38am. National Rail marked it cleared at 1.49pm.
Source: National Rail live travel information. Last checked at 2.25pm on Tuesday 17 November.
Have your say